Multi-Seal
Painting a façade is a time-consuming process for which you should allow several days. You should plan one to two days for preparation. The priming and main coats will then take at least another two days, depending on the size of the façade. If you don’t have your own scaffolding, you can usually rent some from a DIY store for a fee.
Tip: Wait for the ideal time to paint the façade. If the sun is shining directly on it, the paint dries too quickly and lap marks become visible. The outside temperature should be above +5 °C during application and drying (including at night). Humidity should not be too high so that the coating can dry properly.